Installation jobs we take on
Most installs start with one of these:
- Worn-out machines in a laundry room are being replaced.
- New machines have been delivered and are sitting in the hallway.
- A room needs stack dryers to fit more machines into the same space.
- A laundromat refit means moving machines around the floor.
- A new washer walks or leaks because it was set up badly the first time.
- New machines need their prices and cycles programmed.
If you have already bought the machines, they are installed and set up. If you haven't, say so when you call and you get advice on what suits the room and its hookups.
Why set-up matters on a commercial washer
Commercial washers spin hard. A machine that isn't level walks across the floor and bangs on the spin. A hard-mount machine that isn't anchored the way its maker requires does the same, and wears out its bearings early.
Stacking follows the same logic. Stack dryers are built as one unit with two pockets, and stacked washer-dryers come as a matched pair. Single machines that aren't made to stack shouldn't be stacked.
On dryers, the exhaust run and make-up air decide how well the machine dries. A dryer hooked to a poor exhaust run will be slow from its first day.
Before the install date
The room needs a few things ready before machines go in:
- Water supply valves for each washer.
- A drain that can take the machine's flow.
- The right electrical supply for each machine.
- For dryers, a proper exhaust run and make-up air, and a gas supply for gas models.
If something is missing, you are told before the install date so it can be sorted first.
A single washer or dryer is usually set up in a few hours. A room of machines is scheduled over one or more days. We quote the job once we know the machines and the room, and vend prices, cycle times and options are set on the controls before the machines go into service.